UML (Unified Modeling Language) is a standardized modeling language used for developing complex object-oriented software projects. One of its components is the activity diagram, which describes the algorithms of interacting parallel processes.

In its simplest form, an activity diagram can be represented as a scheme consisting of nodes and arcs. Each node corresponds to an activity, while an arc represents the transfer of control between two nodes.

A scheme is considered correct if it consists of nodes of the following five types:

  1. State: An action is performed in this node. It has at most one arc entering and at most one arc exiting.

  2. Decision: This node has one arc entering and two or more arcs exiting. Each exiting arc corresponds to a condition, and only one of the conditions should be true. Control is transferred along the arc of the true condition.

  3. Merge: This node has two or more arcs entering and one exiting. A merge signifies the end of several conditional behavior paths initiated by a decision.

  4. Synchronization Bar: This node has one arc entering and at least two arcs exiting. It is used to describe the parallel behavior of the system. When executed, control is transferred along all exiting arcs.

  5. Join: This node has two or more arcs entering and one exiting. A join is executed when it receives control from all entering arcs.

Thus, conditional behaviors are shown by decisions and merges, while parallel behaviors are shown by synchronization bars and joins. In a UML scheme, two state nodes are highlighted: the initial state and the final state. The diagram begins in the initial state and ends in the final state. Every node is reachable from the initial state, and from every node, the final state is reachable. A path is a sequence of nodes in the diagram. The entry of a node is the node whose exit arc enters the given node. The exit of a node is the node whose entry arc exits from the given node.

Some combinations of decisions and synchronization bars are difficult, or even impossible, to interpret on traditional von Neumann computational systems, as they can lead to potentially infinite numbers of parallel paths. Therefore, both the UML standard and most of its implementations define several constraints on the diagram's structure.

Your task is to write a program that reviews the diagram description and checks its correctness and compliance with the following constraints:

The activity diagram in the UML language is specified as follows. Each node of the diagram is marked with an integer (the node number). The type of node is indicated by an uppercase Latin letter:

S — state,

D — decision activity,

M — merge,

B — synchronization bar,

J — join.

An example of a simple activity diagram in the UML language is shown in the figure. In it, — initial state, — final state, and — synchronization bars, — join, — decision, — merge. All other nodes of the diagram are states.

Input

The first line of the input file contains an integer (N \leq 10000), the number of elements in the diagram. The nodes of the diagram are numbered from to N-1. The initial state is numbered , and the final state is numbered N-1. In each of the next lines, the nodes of the diagram are described in order, one per line. The description of one node contains, in the first position, one character — the type of node, and then (depending on the node type) information about entries and exits may follow. For the initial state, only the exit number is specified; for the final state, only the entry number is specified. For all states except the initial and final, the entry number is specified first, then the exit number. For other types of nodes, no additional information is provided.

Output

In the output file, print CORRECT if the diagram is correct and meets all constraints. Otherwise, print INCORRECT.